The DFM Checklist: 20 Questions to Ask Before You Release Files
A practical, engineering-grade checklist that covers everything from stackup and footprints to test coverage and mechanical tolerance — before your Gerbers leave your hands.
You've finished layout, the DRC is clean, and you're ready to release files to the CM. Before you do, run through this checklist. It takes 30–60 minutes. It has prevented re-spins on more programs than we can count. Every question on this list corresponds to a real failure mode we've seen in production.
Fabrication
Assembly
Bill of Materials
Test & Mechanical
"This checklist doesn't replace a DFM audit — it's what you run the night before files go out. The audit goes deeper and catches the things this list can't."
If you've worked through this checklist and still have questions about your design's production readiness, a full DFM audit is the next step. We review against all 20 points on this list plus an additional 50+ checks covering SI, thermal, EMC, and supply chain risk — and we deliver the report in 48 hours.
Want the Full 70-Point DFM Audit?
This checklist is the starting point. Our full DFM audit goes deeper and delivers a report in 48 hours.